A major engineering triumph, the 8,500 meter Otira tunnel was completed in 1923, sixteen years after tenders were first called. The initial contractors went out of business and the project was completed by the Public Works Department. From the start the problems of steam trains in long tunnels were avoided by using electric locomotives supplied by the English Electric company. (A steam powered electricity generator was installed at Otira).

The tunnel has a gradient of 1 in 33 from Arthur's Pass down to Otira.

The English Electric representative at the tunnel opening was its Chief Engineer, Evan Parry. Parry had been an outstanding first Chief Electrical Engineer of the Public Works Department and had a major role in the introduction of the technology to New Zealand.
Powered By Subgurim(http://googlemaps.subgurim.net).Google Maps ASP.NET
Note: Location is approximate.

Photos

No images found
Upload a new photo
To upload a photo you first need to be registered and logged in.

Comments

There are no comments against this attraction.

To add a new comment you will first need to log in (or register if you haven't yet).